Monday, December 23, 2019
Is The Vice President s Comments About Cost And Schedule...
1. Are the vice presidentââ¬â¢s comments about cost and schedule variance correct? Yes! As we have seen in the case study the Spokane industries are very particular about the earned value reports, as we seen in the reports that the Franklin electronics provided is seemed to be a very basic according their view. The values of cost variance at the 2nd month are like 6K, 2K, 3K, 3K, here the total comes to 14k ($14,000) and the same cost variance in the following month are presented as 7K, 3K, 5K, 10K ($25,000) respectively, so here we can see that the values that were provided in the 2nd month are less than 3/4th of the 3rd month. Comes to the scheduling variance the values given to the 2nd month are said to be 8K, 1K, 2K, 20K ($31,000), the 3rd month calculations are in the order 12K, 3K, 4K, 26K ($45,000), so by seeing this we can easily say that the scheduling variance is overrated nearly 50% of its value in the previous month. So, whatever the sponsor said in the case study is true. I hope their main aim for the need of these earned value reports is to reduce the interchange meetings and to finish the project within the basic 3 constraints of a project management. That is why they opted a formalized project management. From the case study it is very easy for us to make sure that they believed earned value reports are some techniques to avoid the interchange meetings. The reduction in interchange meetings automatically reduces time for discussing the completed work rather thanShow MoreRelatedProject Management: Construction of an Ultra Modern Hospital17353 Words à |à 70 PagesSCOPE CONTROL 19 3.0 PROJECT TIME MANAGEMENT 20 RESOURCE BREAKDOWN STRUCTURE 23 PRECEDENCE DIAGRAM OF SCHEDULED ACTIVITIES 27 4.0 CONTROL SCHEDULE 38 ESTIMATING COST OF THE PROJECT USING WBS 38 5.0 PROJECT COST MANAGEMENT 39 INTRODUCTION 39 COST MANAGEMENT APPROACH 41 MEASURING PROJECT COSTS 42 REPORTING FORMAT 43 COST VARIANCE RESPONSE PROCESS 43 COST CHANGE CONTROL PROCESS 43 PROJECT BUDGET 43 SPONSOR ACCEPTANCE 45 6.0 QUALITY MANAGEMENT PROCESS PLAN 46 (University for Development StudiesRead MoreChapter 14 Operational Performance Measurement: Sales and Direct-Cost Variances, and the Role of Nonfinancial Performance Measures26317 Words à |à 106 PagesChapter 14 Operational Performance Measurement: Sales and Direct-Cost Variances, and the Role of Nonfinancial Performance Measures Case 14-1: Pet Groom and Clean Company Readings 14-1: ââ¬Å"Standard Costing Is Alive and Well at Parker Brassâ⬠by D. Johnsen and P. Sopariwala, Management Accounting Quarterly (Winter 2000), pp. 12-20. The Brass Products Division of the Parker Hannifin Corporation is a world-class manufacturer of tube and brass fittings, valves, hose, and hose fittingsRead MoreCma Solutions63195 Words à |à 253 PagesContribution margin analysis (MA) Paradox Manufacturing Limited Shanks Golf School Epic Ltd. Worldtech Cost behaviour (MA) Brookfield Gearbox Products Cost of capital (CF) Windsor Co. Ltd. Harvard Industrial Tools Inc. Cost-volume-profit (CVP) analysis (MA) Lupizan Inc. Epic Ltd. Decision analysis under uncertainty (MA) Fleeliner Company Slick Ltd. Worldtech Departmental costing and cost allocation (MA) Peters Company Ltd. Shanks Golf School CMA Canada 2 Entrance ExaminationRead MoreEssay on Apollo Shoes Case33718 Words à |à 135 Pagesstudent to present their findings in such as a way, so that they can easily refer back to their recommended audit action. o This is also an excellent time to emphasize the importance of audit documentation. Many students will not think about including copies of the minutes with the review memo. This presents a good opportunity to explain how their supervisor will review their work and you do not want them to have to re-audit their work. â⬠¢ Materiality o Due to the limitationsRead MoreProject Managment Case Studies214937 Words à |à 860 Pages(800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002. Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books. For more information about Wiley products, visit our Web site at www.wiley.com. Library of Congress Cataloging-in-Publication Data: Kerzner, Harold. Project management : case studies I Harold Kerzner. -- 2nd ed. p. cm. Includes bibliographical references and index. ISBN-13:Read MoreTop 1 Cause for Project Failure65023 Words à |à 261 PagesFeatured discussion In your experience, what is the TOP #1 cause for Project failure? From experience, the following are the TOP10 causes of Project failure that Mathew can think of (they are not in any kind of order): #1. Lacking Sponsor s Involvement/Ownership #2. Halo Effect (Wrong Man for the Job) #3. Poor HR Management #4. Poor/Inadequate Project Communications #5. Ignoring Project Stakeholders #6. Absence of Risk Management #7. Scope Creep/Unrealistic Expectations ( scope creep:Read MoreCase Study for Management Accounting36912 Words à |à 148 PagesAccounting Association. These cases provide a wide range of topics and contexts for use in upper level undergraduate and MBA classes. Here is a list of the cases, authors and topics discussed. Bal Seal Engineering, by Robin Cooper, discusses alternative cost management approaches: traditional, ABC, and TOC. Billââ¬â¢s Custom Planters, by William Stammerjohan and Deborah Seifert, discusses production and cash flow projections, developing pro forma statements and sensitivity analysis. Dublin Shirt Company, byRead MoreCase Study for Management Accounting36918 Words à |à 148 PagesAccounting Association. These cases provide a wide range of topics and contexts for use in upper level undergraduate and MBA classes. Here is a list of the cases, authors and topics discussed. Bal Seal Engineering, by Robin Cooper, discusses alternative cost management approach es: traditional, ABC, and TOC. Billââ¬â¢s Custom Planters, by William Stammerjohan and Deborah Seifert, discusses production and cash flow projections, developing pro forma statements and sensitivity analysis. Dublin Shirt Company, byRead MoreInside Fedex Express15684 Words à |à 63 PagesFedEx Express and is physically separated into domestic and international segments. This separation is a defining characteristic company-wide, in fact, with two executive vice presidents splitting duties along these geographic lines. Service quality is a primary concern both domestically and internationally. Although schedule stability and optimization are highly valued, the system is so complex that the idea of perfect optimization is sometimes not possible. While at the company, I spentRead MoreCost Accounting134556 Words à |à 539 PagesSolutions Manual for COST ACCOUNTING Creating Value for Management Fifth Edition MICHAEL MAHER University of California, Davis Table of Contents Chapter 1 Cost Accounting: How Managers User Cost Accounting Information Chapter 15 Using Differential Analysis for Production Decisions Chapter 2 Cost Concepts and Behaviour Chapter 16 Managing Quality and Time Chapter 3 Cost System Design: An Overview Chapter 17 Planning and Budgeting Chapter 4 Job Costing Chapter
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.